MHS
Project Summary
MHS - FedEx Phoenix, AZ Distribution Factory Electrical
Project Description
Hired by MHS to execute electrical installation for FedEx Ground Project in Phoenix AZ. SIE tasked with providing labor to demo old equipment, controls, motors & disconnects as well as wiring and new equipment installs.
Application:
- Demo old equipment / Install new equipment
- Power distribution / Controls & Automation
Technical Scope:
- Demo & remove old wire, pipe & disconnects.
- Install and connect new MCP.
- Provide and install 200A 3 Phase 480V feeder & 150A 480V feeder.
- Provide & install new conduit & wiring to motors along with local disconnect at each station.
- Install industrial fans along load doors with local switch for control.
- Install light fixtures over dock doors with local switch.
- Provide new conduit & wiring at each device.
- Install and connect each device to a pre-listed location.